Construction
Field construction, hands-on builds, and the soil testing that every construction project depends on.
Status key: Completed = finished, with a deliverable · In Progress = current coursework or work underway · Planned = defined, not yet started
Geotechnical Engineering Lab
IN PROGRESS · CIVE 3475 Geotechnical Engineering & Applications · Fall 2026 · Five-student lab group
Question: how does a campus soil sample behave as its moisture content changes, and how does it classify?
Tests: Atterberg limits (Casagrande liquid-limit cup and plastic-limit thread rolling), oven-dry water content, and flask specific gravity.
Results
- Liquid limit 31% (read at 25 blows), plastic limit 20%, plasticity index 11%
- Water content 26.5% (average of 3 samples)
- Specific gravity 2.61 (typical range 2.54–2.86)
- Classification: CL, predominantly clay with low plasticity (USCS, ASTM D2487)
Data check: water content rose with blow count, the opposite of the expected trend. The team traced it to a likely moisture or weighing error in one or more trials.
Classify a soil from its Atterberg limits
Enter a liquid limit and plastic limit to see where the soil falls on the Casagrande plasticity chart. Pre-filled with my CIVE 3475 lab result.

TOPLINE Seamless Gutter Installation
COMPLETED · Assistant Installer · Brownsville, TX · Jun – Dec 2025
Installed residential seamless gutter systems as part of a three-person crew, from roofline layout through installation, paying attention to alignment, slope, water-flow direction, and discharge routing on each jobsite.
My contribution
- Took measurements so components fit and met project specifications
- Checked alignment and positioning during installation
- Set and maintained gutter slope for proper drainage
- Followed the installation sequence so the finished system worked as intended
What I learned: measurements, alignment, slope, material fit, and installation sequence all decided whether the finished system performed as intended.
Construction and installation experience, not engineering design.

Picnic Table: Design to Build
COMPLETED · Personal project, not coursework
I designed a picnic table in CAD, then built it with a group of friends from pressure-treated lumber.
- Planned the leg-frame layout and overall table structure
- Assembled the frame with bolted joints
- Built the tabletop and benches