Transportation 

Traffic, roadway, and intersection work: a first-year team study, current coursework, and a day with practicing transportation engineers.

Status key: Completed = finished, with a deliverable · In Progress = current coursework or work underway · Planned = defined, not yet started 

Intersection Signal Study 

COMPLETED · CIVE 1101 Introduction to Civil Engineering · Fall 2023 · Five-person team

Problem: the intersection of Paredes Line Rd & FM 550 in Brownsville has a history of fatal collisions.

My role: co-managed the five-person student team.

Process: Problem → Investigation → Sensor / control concept → Recommendation → Cost estimate

Recommendation: sensor-based, semi-actuated signal control.

Team cost estimate: $67,000–$80,000 per intersection. 

TEDSI Infrastructure Group Job Shadow 

COMPLETED · UTRGV C.E.MENTor Program · August 5, 2026 · Mission, TX

About four hours shadowing transportation engineers at TEDSI Infrastructure Group, a consulting firm.

  • Introduction to consulting engineering and the firm's work
  • Roadway design and earthwork profiling, including how survey data feeds into roadway profiles
  • The 30% design submittal process
  • Drainage design on an active roadway project: contour maps, roadway elevations, runoff, and hydraulic modeling used to place storm drain inlets
  • Engineers working in MicroStation and OpenRoads Designer to TxDOT standards

Takeaway: the engineers stressed professional licensure, communication and networking, familiarity with TxDOT standards, and preparing early for the FE exam. 

Transportation Engineering 

IN PROGRESS · CIVE 3345 · Fall 2026

Current coursework, including:

  • Transportation system overview: transportation versus traffic engineering, and the role of transportation in economic development, safety, and energy use at the national and Texas levels
  • Traffic flow theory: speed-density, speed-flow, and flow-density relationships, capacity, and free-flow speed

Results will be added once the course work is complete.